Material |
100% pure PVC |
width |
1.8m |
size |
20m, slitting size |
Thickness of wear-resistant layer |
0.8-1.5mm |
Total thickness |
3.5mm - 4.5mm |
Packaging and transportation |
kraft paper |
Thickness: |
3.5 mm |
Length: |
20 m |
Width: |
1.8 m |
Color: |
lemon yellow, orange, dark blue,light blue,light green,fruit green,rose red,dark gray,light gray |
Warranty: |
1years |
Application: |
Kindergarten, Dance Room, Gym, etc |
Feature
1. Food - grade raw material safety and environmental protection
2. Wood floor texture design simple and natural, pavement texture atmosphere
3. Anti - slip surface layer enhances floor friction
4. Glass fiber and polyester mesh cloth to enhance floor stability
Installation Instructions
Installation Notes
Before Installation:
- unloading ,take care of packing,especially the surface of flooring.Please roll or move the rolls in the direction that we roll the flooring,not in reverse direction.
All rolls please be stand up in the installation facilities for at least 24 hours,let the flooring assimilate the room's temperature and humidity.
- .The ground must be do waterproof.If it is a new built venue,or new doing self leveling treatment,then the installation only be done after the ground dry. For new built venue,the ground should wait at least 3-6 months before doing the installation of flooring.
All ground should be level,dry,no cracks,no sands and dust.Including concrete,ceramic tiles,wood floor...
IF there is cracks or not level,then must fill and level up by gypsum powder or putty powder.
Full Glue Installation:
- Lay out and put all flooring together to the suitable position.then unroll a half of one roll,and scraping a certain glue on the ground,when the glue are almost near to dry when we touch it by hand (about 10-20 minutes),then Glue the flooring on the ground.
- Using a wood bord to press and pushing the flooring surface to make sure there is no bubble or air between the ground and floor.finally,press and roll the flooring surefafe by professional metal roller.
- Grooving: should be test grooving and welding on one small pc of flooring firstly. make sure the groove depth is about 1/2 thickness of flooring, grooving the same width on both edges of two rolls
- Welding:Make sure the temperature is set to 8.5-9.5 marking,almost reach 850-900 degree centigrade.Then pull the welding gun to welding the rod with flooring together.
- Using the moon blade knife cut the ledge of welding rod to make sure the flooring surface smooth.
Detailed Photos
Related Product
Packaging & Shipping
Company Profile
1. Our company is a high & new technology enterprise specially engaged in developing, manufacturing and selling PVC carpet, wedding carpet, velour, diatom mud mat, embossed doormat, PVC floor, sports flooring, and SiC (silicon carbide) heating elements.
2. It established in the year 2007, with more than 16 years experience for produciton.
3. Products are exported to USA, Germany, France, Poland, Spain,Turkey, Russia, Ukraine, Japan, Korea, Singapore, Vietnam, Thailand and Iran, etc.. They are highly approved by our customers all over the world.
https://jiaxincarbide.en.made-in-china.com/